FICHA DE PROYECTO

NOMBRE: RUTA LETHEM - LINDEN
CODIGO: GUY09
EJE: Escudo Guayanés
PAÍSES:
GUYANA
ETAPA DEL PROYECTO: PRE-EJECUCIÓN  
ÁMBITO: NACIONAL
SECTOR: Transporte
SUBSECTOR: Carretero
TIPO DE OBRA: Pavimentación (obra nueva)
API: SI  
ANCLA: SI  
INVERSIÓN TOTAL DEL PROYECTO EN U$S: 250.000.000

Mapa

ALCANCE DEL PROYECTO

OBJETIVO:

The main objectives of the projects are:

1. To improve the transport link between Guyana and Brazil in order to increase trade and promote greater cultural exchanges between the two countries;

2. to stimulate greater economic development of the 'hinterland' regions of Guyana and the State of Roaraima of Brazil, through improved access to the export markets of North and Central America and the Caribbean via Guyana's port facilities, and

3. to create a North-South transport link, which will provide a complete integration of the countries in the Guyana Shield Hub if complimented by an East-West transport link passing through Venezuela, Guyana, Surinam and French Guyana.

DESCRIPCIÓN:

The Boa Vista - Georgetown interconnection is comprised of two distinct sections of roadway; (i) the Georgetown - Linden roadway, which is a paved and can accomodate traffic to international standards, and (ii) the Linden-Lethem Road, which is a gravel-surfaced road with numerous wooden bridges and a ferry-crossing over the Essequibo River at Kurupukari.

The solution required for the Linden-Lethem Road involves: the upgrading of the roadway to a paved surface, replacement of the wooden bridges with concrete and/or steel ones, and construction of a major bridge at Kurupukari.

PROYECTOS RELACIONADOS:

COD. NOMBRE DEL PROYECTO
GUY42
GUY43

DESCRIPTORES:

DESCRIPTOR
VALOR
UNIDAD DE MEDIDA
Ancho de bermas
 
m
Ancho de calzada
 
m
Ancho de plataforma
 
m
Derecho de Vía
 
m
Jerarquía de la vía
 
Red Nacional/Provincial/Municipal (km)
Longitud de vía
 
km
Número de carriles por vía
 
número
Número de vías
 
1 o 2
Puentes
 
cantidad
Puentes
 
m
Relieve
 
Llana(km)
Relieve
 
Montañosa(km)
Relieve
 
Ondulada (km)
Superficie actual
 
Carpeta/Tratamiento superficial/Hormigon/Ripio/ Tierra (ha)
Superficie de Rodadura a implantar
 
Flexible/Rígida
Transito medio diario anual
 
TMDA
Tuneles
 
cantidad
Tuneles
 
m
Viaductos
 
cantidad
Viaductos
 
m

SITUACION GUYANA:

The Governments of Guyana and Brazil have setup a Joint Working Group on infrastructure that is currently discussing the modalities for the financing of the Linden - Lethem road segment as well as a Deep Water Harbour at New Amsterdam and Hydro Electric Plants in the Upper and Middle Mazaruni, Guyana .  A joint report with concrete actions and decisions was completed June 2013 and submitted to the Heads of State of Brazil and Guyana.  Resulting from the recommendation of the Working Group, a Guyana/Brazil Joint Commission on Infrastructure has been setup to co-ordinate and bring to finality the Energy and Transportation projects being jointly pursued. Presently, the draft Terms od Reference for Detailed Engineering Study is being reviewed by Brazil while simultaneously multiple sources for the financing of the study is being pursued.

A new administration was elected to office in Guyana in May 2015. From all indications, the construction/upgrade of the Linden-Lethem Road is a major priority.  Currently the IADB is undertaking a new feasiblity study that examines the joint benefits of upgrading the Linden-Lethem Road and the development of a deep water harbour in Berbice.  That study will conclude by December 2016 and will provide the new Gov't with additional information for decision making.

RIESGOS Y AMENAZAS

COMENTARIO

COSTO Y FINANCIAMIENTO DEL PROYECTO

TIPO DE FINANCIAMIENTO: PÚBLICO
FUENTE INVERSIÓN (EN US$) ESTADO DEL FINANCIAMIENTO
A DEFINIR 250.000.000 en trámite
INVERSIÓN TOTAL EN US$   250.000.000  

INCLUIDO EN EL PRESUPUESTO NACIONAL: Sin especificar
AÑO:
MONTO DE LOS ESTUDIOS EN US$: 1000000
FUENTE DE FINANCIAMIENTO DE LOS ESTUDIOS: BID - PUBLICO

ESTADO DEL PROYECTO

ETAPA DEL PROYECTO: PRE-EJECUCIÓN  
FECHA ESTIMADA DE FINALIZACIÓN: 31/10/2022
LICENCIA AMBIENTAL: NO
ESTADO DE LOS ESTUDIOS: Iniciado

RESPONSABLE DE LA INFORMACIÓN

COORDINADOR NACIONAL GUYANA
  • NOMBRE: ELISABETH HARPER
  • EMAIL: eaharper@minfor.gov.gy
  • TELEFONO: (592) 225-7404
  • INSTITUCION: Ministry of Foreign Affairs
RESPONSABLE ÚLTIMA MODIFICACIÓN GUYANA
  • NOMBRE: Patrick Thompson
  • EMAIL: pthompson@wsg.gov.gy
  • TELEFONO:
  • INSTITUCION:
  • FECHA MODIF.: 02/06/2016 10:03:23